INQUIRY
Leave Your Message

Net Metering in the Netherlands: What Changes by 2027 and How to Prepare with XDS Plug in Battery

2025-09-22

1) What’s officially decided now

  • Phase-out starting 2025 was rejected by the Eerste Kamer on 13 Feb 2024

  • The government’s new proposal ends net-metering on 1 Jan 2027; consumers will receive a (reasonable) export compensation from their supplier instead of one-to-one netting. Government and public pages now reflect the 2027 end date.

  • Implication: In 2025–2026 you still benefit from full net-metering; after 2027, value shifts to using more solar onsite (and timing consumption smartly).

    2) What this means for homeowners & installers

    • Self-consumption > export: Shifting dishwasher/EV/heat-pump to sunny or low-price hours matters more after 2027.

    • Dynamic contracts & batteries: With dynamic tariffs, a home battery can charge at low prices / discharge at high or during peak-tariff windows.

    • Export compensation: Exact €/kWh will be set by retailers; the state requires a “reasonable compensation” (not negative). Expect variations by supplier. 
  • 3) How the XDS series helps (now and post-2027)

    • Dynamic Tariff Optimization: XDS learns price curves to charge low / discharge high, reducing bills when net-metering ends.

    • Zero-Export & Grid Compliance: Works with supported smart meters (e.g., Shelly / Tibber / HomeWizard P1) to cap feed-in when required.

    • AC-Coupled today, PV-Hybrid optional:

      • XDS4.1: AC-coupled + optional PV input up to 3×1100 Wp (3300 Wp).

      • BM2400: Compact AC-coupled, strong UPS ≤10 ms backup. (Model choice depends on load and roof PV.)

    • Open Modbus / EMS integration: Easy to link with third-party EMS and dynamic suppliers.

    • UPS ≤10 ms: Keeps essential loads on during outages.

    4) Migration plan for 2025–2027

    1. 2025–2026: Use full net-metering while installing PV + XDS; start dynamic-contract trials; set zero-export in flats or grid-limited sites.

    2. H2 2026: Tune battery size (2.4–2.88 kWh units stackable) and schedules for your tariff.

    3. From 2027: Prioritize self-use routines, automate with EMS/Modbus, review supplier export rates quarterly.

    Want a site audit or price simulation? Our team can model your bill under today’s net-metering and post-2027 export compensation, then size the right XDS configuration.

    Sources: Dutch Senate rejection (Feb 13, 2024) and government pages confirming end-date 1 Jan 2027; market guidance on dynamic tariffs and self-consumption.